<?xml version="1.0" encoding="UTF-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/">
<title>II Simposio Argentino de Informática Industrial (SII 2013)</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94076" rel="alternate"/>
<subtitle/>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94076</id>
<updated>2026-10-30T13:21:59Z</updated>
<dc:date>2026-10-30T13:21:59Z</dc:date>
<entry>
<title>Integración de modelos de planeamiento y scheduling en sistemas de información empresariales</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94537" rel="alternate"/>
<author>
<name>Vidoni, Melina C.</name>
</author>
<author>
<name>Rodríguez, María Analía</name>
</author>
<author>
<name>Vecchietti, Aldo R.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94537</id>
<updated>2020-04-30T04:03:04Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
La aplicación e implementación de modelos matemáticos tendientes a colaborar con la toma de decisiones no resulta un proceso sencillo y directo: existen diversos factores que dificultan la integración de los modelos matemáticos desarrollados con los sistemas de información empresariales. ERP 2 Optimizer Linkage (E2OL) es un sistema que acopla un modelo matemático al sistema empresarial o ERP utilizado, proveyendo las interfaces necesarias para la adecuada visualización y facilitando el modelado de problemas típicos presentes en la gestión de empresas de producción, al incrementar el empleo de los modelos de optimización de la planificación y scheduling en los procesos de manufactura de las empresas.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>La aplicación e implementación de modelos matemáticos tendientes a colaborar con la toma de decisiones no resulta un proceso sencillo y directo: existen diversos factores que dificultan la integración de los modelos matemáticos desarrollados con los sistemas de información empresariales. ERP 2 Optimizer Linkage (E2OL) es un sistema que acopla un modelo matemático al sistema empresarial o ERP utilizado, proveyendo las interfaces necesarias para la adecuada visualización y facilitando el modelado de problemas típicos presentes en la gestión de empresas de producción, al incrementar el empleo de los modelos de optimización de la planificación y scheduling en los procesos de manufactura de las empresas.</dc:description>
</entry>
<entry>
<title>Modelo matemático para la síntesis del proceso de elaboración de té negro</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94536" rel="alternate"/>
<author>
<name>Vargas, Rafael R. A.</name>
</author>
<author>
<name>Vecchietti, Aldo R.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94536</id>
<updated>2020-04-30T04:03:07Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
El proceso de producción de té negro tiene múltiples variantes, cada una con sus respectivas ventajas técnicas y económicas. En este trabajo se propone un modelo matemático para realizar la síntesis del proceso de elaboración del té, teniendo como objetivo la minimización de los costos de inversión y de operación de la planta. En el modelo se incluyen algunas características de la industria del té negro en la Argentina. Para la formulación del modelo se definió una superestructura que contempla las distintas alternativas para cada etapa de procesamiento de esta industria. Como resultado de este trabajo se obtuvo un programa disyuntivo, debido a que algunas decisiones discretas del mismo se expresaron como disyunciones. El modelo disyuntivo resultante fue transformado a un programa matemático mixto entero lineal (MILP: Mixed Integer Linear Program) por medio de relajaciones Big-M.&#13;
La solución del problema permite mejorar y analizar los diseños de plantas o evaluar posibles extensiones.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>El proceso de producción de té negro tiene múltiples variantes, cada una con sus respectivas ventajas técnicas y económicas. En este trabajo se propone un modelo matemático para realizar la síntesis del proceso de elaboración del té, teniendo como objetivo la minimización de los costos de inversión y de operación de la planta. En el modelo se incluyen algunas características de la industria del té negro en la Argentina. Para la formulación del modelo se definió una superestructura que contempla las distintas alternativas para cada etapa de procesamiento de esta industria. Como resultado de este trabajo se obtuvo un programa disyuntivo, debido a que algunas decisiones discretas del mismo se expresaron como disyunciones. El modelo disyuntivo resultante fue transformado a un programa matemático mixto entero lineal (MILP: Mixed Integer Linear Program) por medio de relajaciones Big-M.&#13;
La solución del problema permite mejorar y analizar los diseños de plantas o evaluar posibles extensiones.</dc:description>
</entry>
<entry>
<title>Modelo conceptual para la integración de PRONTO con el estándar ISO 15926</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94419" rel="alternate"/>
<author>
<name>Sonzini, María Soledad</name>
</author>
<author>
<name>Vegetti, Marcela</name>
</author>
<author>
<name>Leone, Horacio P.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94419</id>
<updated>2020-04-28T04:03:52Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
En el presente trabajo se propone un modelo conceptual basado en el estándar ISO 15926, con el fin de extenderlo y hacer explícita la representación de variantes de productos propuestos por PRONTO. Esta extensión permitirá introducir el modelo de producto en un entorno colaborativo, donde los sistemas de información son capaces de intercambiar información de productos con otros sistemas. La interoperabilidad de sistemas tiende a aumentar la consistencia de modelos ante la diversidad de interpretaciones. Por ello, la propuesta introduce nuevos elementos al modelo de datos del estándar, para tener un mapeo completo con los conceptos de PRONTO. Además, se representa en el tiempo los cambios producidos en la información de producto, a través del enfoque 4D.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>En el presente trabajo se propone un modelo conceptual basado en el estándar ISO 15926, con el fin de extenderlo y hacer explícita la representación de variantes de productos propuestos por PRONTO. Esta extensión permitirá introducir el modelo de producto en un entorno colaborativo, donde los sistemas de información son capaces de intercambiar información de productos con otros sistemas. La interoperabilidad de sistemas tiende a aumentar la consistencia de modelos ante la diversidad de interpretaciones. Por ello, la propuesta introduce nuevos elementos al modelo de datos del estándar, para tener un mapeo completo con los conceptos de PRONTO. Además, se representa en el tiempo los cambios producidos en la información de producto, a través del enfoque 4D.</dc:description>
</entry>
<entry>
<title>Optimización en tiempo real con disyunciones lógicas: aplicación a sistemas de calor y potencia</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94417" rel="alternate"/>
<author>
<name>Serralunga, Fernán</name>
</author>
<author>
<name>Mussati, Miguel C.</name>
</author>
<author>
<name>Aguirre, Pío A.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94417</id>
<updated>2020-04-28T04:03:55Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
La optimización en tiempo real (RTO) permite operar en cercanías del óptimo económico de una planta, respetando restricciones y respondiendo a cambios en el proceso. La adaptación con términos modificadores de las restricciones y los gradientes corrige eficientemente los errores estructurales de los modelos de RTO. Este trabajo propone el uso de RTO incluyendo disyunciones lógicas en el problema de optimización, y plantea una estrategia de adaptación con modificadores para este problema. La estrategia se muestra a través de un caso de estudio que consiste en un sistema de generación de vapor y potencia.&#13;
Los resultados obtenidos muestran la validez de la estrategia sugerida y la utilidad de incluir variables discretas o disyunciones en los sistemas de RTO.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>La optimización en tiempo real (RTO) permite operar en cercanías del óptimo económico de una planta, respetando restricciones y respondiendo a cambios en el proceso. La adaptación con términos modificadores de las restricciones y los gradientes corrige eficientemente los errores estructurales de los modelos de RTO. Este trabajo propone el uso de RTO incluyendo disyunciones lógicas en el problema de optimización, y plantea una estrategia de adaptación con modificadores para este problema. La estrategia se muestra a través de un caso de estudio que consiste en un sistema de generación de vapor y potencia.&#13;
Los resultados obtenidos muestran la validez de la estrategia sugerida y la utilidad de incluir variables discretas o disyunciones en los sistemas de RTO.</dc:description>
</entry>
<entry>
<title>Optimización de la producción de poli(β-hidroxibutirato) a partir de glicerol</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94416" rel="alternate"/>
<author>
<name>Ramos, Fernando D.</name>
</author>
<author>
<name>Estrada, Vanina</name>
</author>
<author>
<name>Diaz, María Soledad</name>
</author>
<author>
<name>Villar, Marcelo A.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94416</id>
<updated>2020-04-29T04:03:24Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
En este trabajo se ha realizado el diseño preliminar de una planta de producción de poli(β-hidroxibutirato), PHB, mediante el empleo de microorganismos y a partir de glicerol como materia prima. El proceso consta de tres etapas: purificación de la materia prima, donde la corriente de glicerol, subproducto en la producción de biodiesel, se despoja del metanol que pudiese contener; fermentación, donde se produce PHB a partir de Cupriavidus necátor y por último, extracción del producto, donde se produce la lisis celular y se logra la separación y purificación del biopolímero.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>En este trabajo se ha realizado el diseño preliminar de una planta de producción de poli(β-hidroxibutirato), PHB, mediante el empleo de microorganismos y a partir de glicerol como materia prima. El proceso consta de tres etapas: purificación de la materia prima, donde la corriente de glicerol, subproducto en la producción de biodiesel, se despoja del metanol que pudiese contener; fermentación, donde se produce PHB a partir de Cupriavidus necátor y por último, extracción del producto, donde se produce la lisis celular y se logra la separación y purificación del biopolímero.</dc:description>
</entry>
<entry>
<title>Instante crítico con Jitter: un estado poco probable</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94415" rel="alternate"/>
<author>
<name>Páez, Francisco E.</name>
</author>
<author>
<name>Urriza, José M.</name>
</author>
<author>
<name>Ferrari, Mariano</name>
</author>
<author>
<name>Cayssials, Ricardo</name>
</author>
<author>
<name>Orozco, Javier D.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94415</id>
<updated>2020-04-29T04:03:25Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
Este trabajo trata sobre la probabilidad de encontrar un instante crítico con los peores casos de jitter de instanciación en un Sistema de Tiempo Real. Se analizará mediante simulaciones, que esta condición de planificación acontece muy rara vez, más aún cuando los sistemas poseen numerosas tareas.&#13;
Consecuentemente, basar el diseño del sistema en esta condición puede provocar implementaciones de hardware sobredimensionadas para el funcionamiento normal del mismo. Por otro lado, esta baja probabilidad introduce un gran pesimismo en los métodos de evaluación de planificabilidad.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>Este trabajo trata sobre la probabilidad de encontrar un instante crítico con los peores casos de jitter de instanciación en un Sistema de Tiempo Real. Se analizará mediante simulaciones, que esta condición de planificación acontece muy rara vez, más aún cuando los sistemas poseen numerosas tareas.&#13;
Consecuentemente, basar el diseño del sistema en esta condición puede provocar implementaciones de hardware sobredimensionadas para el funcionamiento normal del mismo. Por otro lado, esta baja probabilidad introduce un gran pesimismo en los métodos de evaluación de planificabilidad.</dc:description>
</entry>
<entry>
<title>Simulación de tareas aperiódicas y esporádicas de tiempo real mediante un modelo de eventos discretos</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94414" rel="alternate"/>
<author>
<name>Páez, Francisco E.</name>
</author>
<author>
<name>Urriza, José M.</name>
</author>
<author>
<name>Orozco, Javier D.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94414</id>
<updated>2020-04-29T04:03:30Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
Este trabajo presenta una extensión a un modelo de eventos discretos para el diseño de simuladores de Sistemas de Tiempo Real con tareas periódicas, incorporando tareas de tipo esporádico y aperiódico. Además, se estudia el soporte para jitter y offset. El modelo de eventos discretos elegido se ajusta a los sistemas dinámicos discretos como lo son los Sistemas de Tiempo Real.&#13;
El uso de simuladores para realizar comprobaciones de algoritmos, modelos, técnicas y para evaluar métricas de rendimiento, es una práctica extendida e importante en la disciplina. El modelo, es diseñado empleando la técnica de grafo de eventos.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>Este trabajo presenta una extensión a un modelo de eventos discretos para el diseño de simuladores de Sistemas de Tiempo Real con tareas periódicas, incorporando tareas de tipo esporádico y aperiódico. Además, se estudia el soporte para jitter y offset. El modelo de eventos discretos elegido se ajusta a los sistemas dinámicos discretos como lo son los Sistemas de Tiempo Real.&#13;
El uso de simuladores para realizar comprobaciones de algoritmos, modelos, técnicas y para evaluar métricas de rendimiento, es una práctica extendida e importante en la disciplina. El modelo, es diseñado empleando la técnica de grafo de eventos.</dc:description>
</entry>
<entry>
<title>Dinámica de sistemas: modelado flexible en logística inversa</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94413" rel="alternate"/>
<author>
<name>Oviedo, Sandra</name>
</author>
<author>
<name>Leiva, Alfredo</name>
</author>
<author>
<name>Díaz, Daniel</name>
</author>
<author>
<name>Forradellas Martinez, Raymundo Quilez</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94413</id>
<updated>2020-04-29T04:03:33Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
Mediante la dinámica de sistemas se pueden construir modelos de sistemas complejos y realizar simulaciones ensayando diferentes escenarios, para mejorar la comprensión de los sistemas y predecir su comportamiento.&#13;
Cuando se habla de flexibilidad en la industria, los autores hacen referencia a la flexibilidad de la tecnología dada por las características de la tecnología que permiten habilitar ajustes u otros cambios a los procesos de negocio, y a la flexibilidad del software dada por su adaptabilidad y versatilidad. Se propone la dinámica de sistemas como una herramienta flexible para el modelado. En el caso de estudio se hizo un modelo para asistir en la toma de decisiones, en dicho modelo fue posible describir flujos físicos, e inmateriales, se pudieron proponer diferentes e hipotéticos escenarios donde se puede analizar el comportamiento del sistema. Este trabajo permitió valorar la dinámica de sistemas como una metodología de modelado flexible.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>Mediante la dinámica de sistemas se pueden construir modelos de sistemas complejos y realizar simulaciones ensayando diferentes escenarios, para mejorar la comprensión de los sistemas y predecir su comportamiento.&#13;
Cuando se habla de flexibilidad en la industria, los autores hacen referencia a la flexibilidad de la tecnología dada por las características de la tecnología que permiten habilitar ajustes u otros cambios a los procesos de negocio, y a la flexibilidad del software dada por su adaptabilidad y versatilidad. Se propone la dinámica de sistemas como una herramienta flexible para el modelado. En el caso de estudio se hizo un modelo para asistir en la toma de decisiones, en dicho modelo fue posible describir flujos físicos, e inmateriales, se pudieron proponer diferentes e hipotéticos escenarios donde se puede analizar el comportamiento del sistema. Este trabajo permitió valorar la dinámica de sistemas como una metodología de modelado flexible.</dc:description>
</entry>
<entry>
<title>Análisis de sensibilidad global en procesos de fermentación para la producción de bioetanol utilizando levadura genéticamente modificada</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94411" rel="alternate"/>
<author>
<name>Ochoa, María Paz</name>
</author>
<author>
<name>Hoch, Patricia</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94411</id>
<updated>2020-04-29T04:03:36Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
En este trabajo se presenta un estudio de sensibilidad global sobre un proceso de fermentación para la producción de bioetanol a partir de la utilización de la levadura genéticamente modificada Sacchromyces 1400 (pLNH33), capaz de fermentar tanto glucosa como xilosa (Wang y Chen, 2010). Se asocian distribuciones de probabilidad a cada uno de los parámetros inciertos y se determinan perfiles temporales para los índices de sensibilidad para las principales variables diferenciales y algebraicas. Se aplica el método propuesto por Sobol' (1990) y se realizan las simulaciones estocásticas en el entorno gPROMS (PSEnterprise, 2009). Los resultados muestran la influencia de los parámetros variable en el tiempo de operación del bioreactor.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>En este trabajo se presenta un estudio de sensibilidad global sobre un proceso de fermentación para la producción de bioetanol a partir de la utilización de la levadura genéticamente modificada Sacchromyces 1400 (pLNH33), capaz de fermentar tanto glucosa como xilosa (Wang y Chen, 2010). Se asocian distribuciones de probabilidad a cada uno de los parámetros inciertos y se determinan perfiles temporales para los índices de sensibilidad para las principales variables diferenciales y algebraicas. Se aplica el método propuesto por Sobol' (1990) y se realizan las simulaciones estocásticas en el entorno gPROMS (PSEnterprise, 2009). Los resultados muestran la influencia de los parámetros variable en el tiempo de operación del bioreactor.</dc:description>
</entry>
<entry>
<title>Planeación reactiva de plantas “batch” multiproducto, multietapa basada en programación con restricciones</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94409" rel="alternate"/>
<author>
<name>Novara, Franco M.</name>
</author>
<author>
<name>Henning, Gabriela P.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94409</id>
<updated>2020-04-29T04:03:38Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
Se presenta una metodología sistemática para abordar el problema de “scheduling” reactivo, es decir, la planeación a corto plazo de una planta “batch” multi-producto, multi-etapa ante la ocurrencia de eventos imprevistos, tales como la salida de funcionamiento de un equipo o la llegada de una nueva orden. El enfoque propuesto apunta a preservar la estabilidad de la agenda original, minimizando el número de cambios que sobre ella se realizan, a la vez que se trata de mantener un buen desempeño con relación a la medida de performance con la que se desarrolló el “schedule” vigente, que generalmente es “Makespan”. Para atender a estos requerimientos se desarrolla un enfoque multi-objetivo, el cual se valida a través de la solución de múltiples ejemplos.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>Se presenta una metodología sistemática para abordar el problema de “scheduling” reactivo, es decir, la planeación a corto plazo de una planta “batch” multi-producto, multi-etapa ante la ocurrencia de eventos imprevistos, tales como la salida de funcionamiento de un equipo o la llegada de una nueva orden. El enfoque propuesto apunta a preservar la estabilidad de la agenda original, minimizando el número de cambios que sobre ella se realizan, a la vez que se trata de mantener un buen desempeño con relación a la medida de performance con la que se desarrolló el “schedule” vigente, que generalmente es “Makespan”. Para atender a estos requerimientos se desarrolla un enfoque multi-objetivo, el cual se valida a través de la solución de múltiples ejemplos.</dc:description>
</entry>
<entry>
<title>Composability model in a distributed simulation environment for supply chain</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94406" rel="alternate"/>
<author>
<name>Gutiérrez, María de los Milagros</name>
</author>
<author>
<name>Leone, Horacio P.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94406</id>
<updated>2020-04-29T04:03:40Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
Distributed simulation become popular through the use of HLA standard and the necessity of sharing resources. Nevertheless composability of model is still a problem to overcome. Many solutions propose the use of ontology and SOA architectures in the context of distributed simulation. This work presents a solution to compose simulation models in the context of supply chain simulation. The proposal presents a network ontology that conceptualizes different aspect to taking into account when a federation for supply chain is developed.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>Distributed simulation become popular through the use of HLA standard and the necessity of sharing resources. Nevertheless composability of model is still a problem to overcome. Many solutions propose the use of ontology and SOA architectures in the context of distributed simulation. This work presents a solution to compose simulation models in the context of supply chain simulation. The proposal presents a network ontology that conceptualizes different aspect to taking into account when a federation for supply chain is developed.</dc:description>
</entry>
<entry>
<title>A Modelling Framework for Optimising Investment for the Australian Livestock Industry</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94405" rel="alternate"/>
<author>
<name>García Flores, Rodolfo</name>
</author>
<author>
<name>Higgins, Andrew</name>
</author>
<author>
<name>Prestwidge, Di</name>
</author>
<author>
<name>McFallan, Stephen</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94405</id>
<updated>2020-04-29T04:03:42Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
Despite the scale and importance of the beef industry in the north of Australia, recent political and environmental disruptions have highlighted the vulnerability of the supply chain. Ensuring that the supply chain remains resilient to climatic events as well as to unexpected decisions by the stakeholders will require careful planning and investment in logistics. In this paper, we outline an integrated methodology based on tactical and operational dynamic models, for assessing the effect of changes in the supply chain. Emphasis is on the development of an optimisation model that covers the ow of cattle from properties to agistment farms and feedlots to abattoirs/ports, and the selection of rest areas (spelling yards) along the path. The model selects the optimal location of spelling yards along the road network, subject to budget, site capacity, and service requirements. We show preliminary results for a case study comprising Western Australia and the Northern Territory.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>Despite the scale and importance of the beef industry in the north of Australia, recent political and environmental disruptions have highlighted the vulnerability of the supply chain. Ensuring that the supply chain remains resilient to climatic events as well as to unexpected decisions by the stakeholders will require careful planning and investment in logistics. In this paper, we outline an integrated methodology based on tactical and operational dynamic models, for assessing the effect of changes in the supply chain. Emphasis is on the development of an optimisation model that covers the ow of cattle from properties to agistment farms and feedlots to abattoirs/ports, and the selection of rest areas (spelling yards) along the path. The model selects the optimal location of spelling yards along the road network, subject to budget, site capacity, and service requirements. We show preliminary results for a case study comprising Western Australia and the Northern Territory.</dc:description>
</entry>
<entry>
<title>Programa de Gestión de Bobinados (ProGeBo): primera parte</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94403" rel="alternate"/>
<author>
<name>Gallo, Omar D.</name>
</author>
<author>
<name>Gallo, Javier A.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94403</id>
<updated>2020-04-29T04:03:43Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
El Programa de Gestión de Bobinados (ProGeBo) es un sitio web (www.progebo.com) destinado a los calculistas y reparadores de motores eléctricos. Se trata, en primer lugar, de un software que calcula y esquematiza bobinados trifásicos introduciendo unos pocos datos fundamentales del paquete de chapas del estator y del propio bobinado del motor eléctrico. Además, ofrece prestaciones tales como generación y archivo de fichas técnicas, acceso a foros, chat y biblioteca técnica. En este trabajo se detallan sus orígenes y objetivos y el método general usado para su desarrollo. Se agregan precisiones sobre los resultados obtenidos al usarlo y finalmente se abordan las expectativas de impacto.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>El Programa de Gestión de Bobinados (ProGeBo) es un sitio web (www.progebo.com) destinado a los calculistas y reparadores de motores eléctricos. Se trata, en primer lugar, de un software que calcula y esquematiza bobinados trifásicos introduciendo unos pocos datos fundamentales del paquete de chapas del estator y del propio bobinado del motor eléctrico. Además, ofrece prestaciones tales como generación y archivo de fichas técnicas, acceso a foros, chat y biblioteca técnica. En este trabajo se detallan sus orígenes y objetivos y el método general usado para su desarrollo. Se agregan precisiones sobre los resultados obtenidos al usarlo y finalmente se abordan las expectativas de impacto.</dc:description>
</entry>
<entry>
<title>Impacto económico-ambiental del planeamiento estratégico de inversiones en el sector energético de la Argentina</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94343" rel="alternate"/>
<author>
<name>Flores, Julio R.</name>
</author>
<author>
<name>Montagna, Jorge Marcelo</name>
</author>
<author>
<name>Vecchietti, Aldo R.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94343</id>
<updated>2020-04-29T04:03:43Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
En este trabajo se presenta un programa de optimización multiperíodo para analizar un plan estratégico de inversiones en el sector energético, que tiene en cuenta los recursos naturales renovables y no-renovables disponibles en la región. El objetivo es ponderar las inversiones desde el punto de vista económico y el ambiental. Este último medido a través de la emisión de gases de efecto invernadero y su apreciación por medio de los bonos de carbono. Se presentan los resultados obtenidos en la evaluación de diversos escenarios con el objeto de realizar un análisis de sensibilidad respecto del valor de mercado de los bonos de carbono y el aumento de reservas de gas natural.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>En este trabajo se presenta un programa de optimización multiperíodo para analizar un plan estratégico de inversiones en el sector energético, que tiene en cuenta los recursos naturales renovables y no-renovables disponibles en la región. El objetivo es ponderar las inversiones desde el punto de vista económico y el ambiental. Este último medido a través de la emisión de gases de efecto invernadero y su apreciación por medio de los bonos de carbono. Se presentan los resultados obtenidos en la evaluación de diversos escenarios con el objeto de realizar un análisis de sensibilidad respecto del valor de mercado de los bonos de carbono y el aumento de reservas de gas natural.</dc:description>
</entry>
<entry>
<title>Comparing the performances of two techniques for the optimization under parametric uncertainty of the simultaneous design and planning of a multiproduct batch plant</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94333" rel="alternate"/>
<author>
<name>Durand, Guillermo</name>
</author>
<author>
<name>Moreno, M. Susana</name>
</author>
<author>
<name>Mele, Fernando D.</name>
</author>
<author>
<name>Montagna, Jorge Marcelo</name>
</author>
<author>
<name>Bandoni, Alberto</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94333</id>
<updated>2020-04-29T04:03:46Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
This paper addresses the comparison between two techniques for the optimization under parametric uncertainty of multiproduct batch plants integrating design and production planning decisions. This problem has been conceived as a two-stage stochastic mixed integer linear programming (MILP) in which the first-stage decisions consist of design variables that allow determining the batch plant structure, and the second-stage decisions consist of production planning continuous variables in a multiperiod context. The objective function maximizes the expected net present value. In the first solving approach, the problem has been tackled through mathematical programming considering a discrete set of scenarios. In the second solving approach, the multi-scenario MILP problem has been reformulated by adopting a simulation-based optimization scheme to accommodate the variables belonging to different management levels. Advantages and disadvantages of both approaches are demonstrated through a case study. Results allow concluding that a simulation-based optimization strategy may be a suitable technique to afford two-stage stochastic programming problems.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>This paper addresses the comparison between two techniques for the optimization under parametric uncertainty of multiproduct batch plants integrating design and production planning decisions. This problem has been conceived as a two-stage stochastic mixed integer linear programming (MILP) in which the first-stage decisions consist of design variables that allow determining the batch plant structure, and the second-stage decisions consist of production planning continuous variables in a multiperiod context. The objective function maximizes the expected net present value. In the first solving approach, the problem has been tackled through mathematical programming considering a discrete set of scenarios. In the second solving approach, the multi-scenario MILP problem has been reformulated by adopting a simulation-based optimization scheme to accommodate the variables belonging to different management levels. Advantages and disadvantages of both approaches are demonstrated through a case study. Results allow concluding that a simulation-based optimization strategy may be a suitable technique to afford two-stage stochastic programming problems.</dc:description>
</entry>
<entry>
<title>Modeling dynamic interactions in supply chains using agentbased simulations</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94332" rel="alternate"/>
<author>
<name>Dorigatti, Mariana</name>
</author>
<author>
<name>Chiotti, Omar Juan Alfredo</name>
</author>
<author>
<name>Salomone, Héctor E.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94332</id>
<updated>2020-04-29T04:03:51Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
In this work, we present preliminary results of our research on the construction of an agent-based simulation framework suitable to support the analysis of complex supply chain interactions as the one required for the performance assessment in collaborative supply chains. In particular we focus in the modeling of dynamic interactions through agent-to-agent message communication avoiding predefined supply chain network structures. For defining the internal structure of agents we explore the application of the SCOR reference model to bring a business process perspective and adopt the requirement of making explicit separation of the execution and control and decision making processes.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>In this work, we present preliminary results of our research on the construction of an agent-based simulation framework suitable to support the analysis of complex supply chain interactions as the one required for the performance assessment in collaborative supply chains. In particular we focus in the modeling of dynamic interactions through agent-to-agent message communication avoiding predefined supply chain network structures. For defining the internal structure of agents we explore the application of the SCOR reference model to bring a business process perspective and adopt the requirement of making explicit separation of the execution and control and decision making processes.</dc:description>
</entry>
<entry>
<title>A branch-and-price method for the Vehicle Routing Problem with Cross-Docking and Time Windows</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94327" rel="alternate"/>
<author>
<name>Dondo, Rodolfo</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94327</id>
<updated>2020-04-29T04:03:52Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
One important factor in supply chain management is to efficiently control the supply chain flows. Due to its importance, many companies are trying to develop efficient methods to increase customer satisfaction and reduce costs. Cross-docking is considered a good method to reduce inventory and improve responsiveness. The Vehicle Routing Problem with Cross-Docking and Time Windows (VRP-CD-TW) consists on designing the minimum-cost set of routes to serve a given set of transportation requests while respecting constraints on vehicles capacity, customer time windows and using transfers on a cross-docking base. Each customer must be visited just once and mixed tours comprising pick-up and delivery stops are not allowed. For a given vehicle, the designed pick-up tour must precede its delivery tour. In this work, we model the VRP-CD-TW assuming that all feasible orders are known in advance. We present a new mixed integer program to model the VRP-CD-TW and reformulate it via Dantzig–Wolfe decomposition to later develop a column generation procedure. The proposed branch-and-price algorithm shows encouraging results on solving some Solomon-based instances.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>One important factor in supply chain management is to efficiently control the supply chain flows. Due to its importance, many companies are trying to develop efficient methods to increase customer satisfaction and reduce costs. Cross-docking is considered a good method to reduce inventory and improve responsiveness. The Vehicle Routing Problem with Cross-Docking and Time Windows (VRP-CD-TW) consists on designing the minimum-cost set of routes to serve a given set of transportation requests while respecting constraints on vehicles capacity, customer time windows and using transfers on a cross-docking base. Each customer must be visited just once and mixed tours comprising pick-up and delivery stops are not allowed. For a given vehicle, the designed pick-up tour must precede its delivery tour. In this work, we model the VRP-CD-TW assuming that all feasible orders are known in advance. We present a new mixed integer program to model the VRP-CD-TW and reformulate it via Dantzig–Wolfe decomposition to later develop a column generation procedure. The proposed branch-and-price algorithm shows encouraging results on solving some Solomon-based instances.</dc:description>
</entry>
<entry>
<title>A Model for Choosing the Right ERP System</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94325" rel="alternate"/>
<author>
<name>Dasso, Aristides</name>
</author>
<author>
<name>Funes, Ana</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94325</id>
<updated>2020-04-29T04:03:53Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
This work presents a model for the evaluation and selection of Enterprise Resource Planning (ERP) systems. Although these systems are used more and more there have been reports of different kind of problems, underlining the need of having models for their evaluation. Evaluation also permits the possibility, for the prospective user, of being able to establish its own requirements and compare different systems to assess which is the one that better adapts to the user’s needs. The model we present here is based on the Logic Score of Preference (LSP) method. An overview of the LSP method is also given.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>This work presents a model for the evaluation and selection of Enterprise Resource Planning (ERP) systems. Although these systems are used more and more there have been reports of different kind of problems, underlining the need of having models for their evaluation. Evaluation also permits the possibility, for the prospective user, of being able to establish its own requirements and compare different systems to assess which is the one that better adapts to the user’s needs. The model we present here is based on the Logic Score of Preference (LSP) method. An overview of the LSP method is also given.</dc:description>
</entry>
<entry>
<title>Una aplicación de lógica difusa en el modelado de una cadena de suministro con incertidumbre en el abastecimiento de materiales</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94323" rel="alternate"/>
<author>
<name>Cunico, María Laura</name>
</author>
<author>
<name>Vecchietti, Aldo R.</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94323</id>
<updated>2020-04-29T04:03:56Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
El problema que se aborda en este artículo tiene como objetivo la optimización de la compra de materiales y entrega de productos en la cadena de suministros, considerando fallas en la provisión de materias primas por parte de los proveedores. El modelo matemático que se formula es mixto entero nolineal (MINLP) y abarca un horizonte de tiempo dividido en varios períodos.&#13;
Para fortalecer la relación con los proveedores se les ofrece contratos de compra, por material adquirido, en cada uno de los períodos propuestos. Para el modelado se recurre a la utilización de conjuntos difusos (fuzzy sets) que permiten asignar grados de confiabilidad a cada proveedor a partir del comportamiento histórico registrado por los mismos. El modelo determina los proveedores y las cantidades comprar y cuáles son los contratos a ofrecer de modo tal de minimizar los costos de compra y almacenamiento de materias primas. El modelo se emplea para realizar un análisis de sensibilidad del proceso de compra y la relación con sus proveedores. Para ello se realiza se proponen varios escenarios fijando la periodicidad de falla de cada proveedor, con estos valores fijos, el modelo MINLP se transforma en uno lineal MILP (Mixed Integer Linear Program) en cada uno de los escenario propuesto. El objetivo principal del artículo radica entonces en exponer una perspectiva distinta a la existente en la literatura cuando la provisión incierta de materiales no presenta una distribución de falla conocida o cuando un enfoque probabilístico no refleja eficientemente el comportamiento de cada proveedor. La resolución de los escenarios propuestos permite visualizar la dependencia del proceso de compra con los proveedores de materias primas.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>El problema que se aborda en este artículo tiene como objetivo la optimización de la compra de materiales y entrega de productos en la cadena de suministros, considerando fallas en la provisión de materias primas por parte de los proveedores. El modelo matemático que se formula es mixto entero nolineal (MINLP) y abarca un horizonte de tiempo dividido en varios períodos.&#13;
Para fortalecer la relación con los proveedores se les ofrece contratos de compra, por material adquirido, en cada uno de los períodos propuestos. Para el modelado se recurre a la utilización de conjuntos difusos (fuzzy sets) que permiten asignar grados de confiabilidad a cada proveedor a partir del comportamiento histórico registrado por los mismos. El modelo determina los proveedores y las cantidades comprar y cuáles son los contratos a ofrecer de modo tal de minimizar los costos de compra y almacenamiento de materias primas. El modelo se emplea para realizar un análisis de sensibilidad del proceso de compra y la relación con sus proveedores. Para ello se realiza se proponen varios escenarios fijando la periodicidad de falla de cada proveedor, con estos valores fijos, el modelo MINLP se transforma en uno lineal MILP (Mixed Integer Linear Program) en cada uno de los escenario propuesto. El objetivo principal del artículo radica entonces en exponer una perspectiva distinta a la existente en la literatura cuando la provisión incierta de materiales no presenta una distribución de falla conocida o cuando un enfoque probabilístico no refleja eficientemente el comportamiento de cada proveedor. La resolución de los escenarios propuestos permite visualizar la dependencia del proceso de compra con los proveedores de materias primas.</dc:description>
</entry>
<entry>
<title>Optimal Production Planning of Concentrated Apple and Pear Juice Plants</title>
<link href="http://sedici.unlp.edu.ar:80/handle/10915/94321" rel="alternate"/>
<author>
<name>Catalá, Luis P.</name>
</author>
<author>
<name>Moreno, M. Susana</name>
</author>
<author>
<name>Durand, Guillermo</name>
</author>
<author>
<name>Blanco, Anibal</name>
</author>
<author>
<name>Bandoni, Alberto</name>
</author>
<id>http://sedici.unlp.edu.ar:80/handle/10915/94321</id>
<updated>2020-04-29T04:03:58Z</updated>
<published>2013-01-01T00:00:00Z</published>
<summary type="text">Objeto de conferencia
II Simposio Argentino de Informática Industrial (SII) - JAIIO 42 (2013)
This paper presents a mathematical model aimed at optimizing the yearly profit of a concentrated apple and pear juice plant through the appropriate design of its production plan. This study assumes a business scenario where the products are devoted to the international market and therefore the production schedule is dictated by a fluctuating prices scenario due to the worldwide supply/demand tradeoff. Moreover, raw fruit is available only during the relatively short harvest season and suffers juice yield reduction during storage. In this context, decisions related to the manufacturing of each juice variety to exploit favorable prices, while minimizing juice yield loss due to fruit aging are not intuitive. Scenario studies, together with sensitivity analysis on some model parameters are developed to illustrate the performance of the proposed approach.
</summary>
<dc:date>2013-01-01T00:00:00Z</dc:date>
<dc:description>This paper presents a mathematical model aimed at optimizing the yearly profit of a concentrated apple and pear juice plant through the appropriate design of its production plan. This study assumes a business scenario where the products are devoted to the international market and therefore the production schedule is dictated by a fluctuating prices scenario due to the worldwide supply/demand tradeoff. Moreover, raw fruit is available only during the relatively short harvest season and suffers juice yield reduction during storage. In this context, decisions related to the manufacturing of each juice variety to exploit favorable prices, while minimizing juice yield loss due to fruit aging are not intuitive. Scenario studies, together with sensitivity analysis on some model parameters are developed to illustrate the performance of the proposed approach.</dc:description>
</entry>
</feed>
