Subir material

Suba sus trabajos a SEDICI, para mejorar notoriamente su visibilidad e impacto

 

Mostrar el registro sencillo del ítem

dc.date.accessioned 2014-07-04T14:29:19Z
dc.date.available 2014-07-04T14:29:19Z
dc.date.issued 2011
dc.identifier.uri http://sedici.unlp.edu.ar/handle/10915/37534
dc.description.abstract The interconnections between electrical systems are a “technical and economic need” in order to facilitate the use and optimization of the energy sources and to improve the supply guarantee. At the same time, transmission lines are the most extended works of the electrical networks, having to carefully analyze their design and line routes since some serious impacts and/or conflicts can be caused or increased due to their location. The space occupancy and the visual perturbation are primary factors of overhead line impact in the environment. On the other hand, the electric (E) and magnetic (B) fields produced by electrical installations have become of great concern to the population, provided their possible link with health aspects. From the environmental point of view, the implantation of a new electrical infrastructure constitutes an intrusion in the landscape that may give rise to a decrease in the quality of the landscape of the location where it is inserted. Such visual impact is directly related with visibility level of the new shape introduced in the land and with the contrast between this and the original landscape. It is possible to assess the capacity of a landscape to absorb certain modifications, minimizing the alterations in the visual qualities that the viewer perceives. This paper shows the procedures followed in local cases where analysis of levels of electrical and magnetic fields and of visual landscapes has been incorporated to electrical project planning and works of electrical projects of 500 kV in AC and ±600 kV in DC. es
dc.language en es
dc.subject visual impact en
dc.subject Suministros de Energía Eléctrica es
dc.subject Impacto Ambiental es
dc.subject magnetic field en
dc.subject electric field en
dc.subject environmental issues en
dc.title Power lines and the public perception en
dc.type Objeto de conferencia es
sedici.identifier.uri https://app.box.com/s/a4793c7ecdfc08e1155a es
sedici.creator.person Wall, Carlos Alberto es
sedici.creator.person Barbieri, María Beatriz es
sedici.creator.person Arnera, Patricia Liliana es
sedici.creator.person Brandariz, Graciela es
sedici.creator.person Camus, María Luz es
sedici.subject.materias Ingeniería es
sedici.subject.materias Electrotecnia es
sedici.description.fulltext true es
mods.originInfo.place Instituto de Investigaciones Tecnológicas para Redes y Equipos Eléctricos (IITREE) es
sedici.subtype Objeto de conferencia es
sedici.rights.license Creative Commons Attribution 3.0 Unported (CC BY 3.0)
sedici.rights.uri http://creativecommons.org/licenses/by/3.0/
sedici.date.exposure 2011-10
sedici.relation.event International Colloquium: Long distance and Cross-border Electric Power System Interconnections: Strategic Needs, Sustainability, Environmental and Social Issues (Tel Aviv, Israel, 2011) es
sedici.description.peerReview peer-review es


Descargar archivos

Este ítem aparece en la(s) siguiente(s) colección(ones)

Creative Commons Attribution 3.0 Unported (CC BY 3.0) Excepto donde se diga explícitamente, este item se publica bajo la siguiente licencia Creative Commons Attribution 3.0 Unported (CC BY 3.0)